Herunterladen Diese Seite drucken

Hilti HIT-HY 200-A Gebrauchsanweisung Seite 27

Vorschau ausblenden Andere Handbücher für HIT-HY 200-A:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Product Information
– Always keep these instructions together with the product even when given to other persons.
– Check expiration date: See imprint on foil pack manifold (month/year). Do not use expired product.
– Foil pack temperature during usage: 0 °C to 40 °C / 32 °F to 104 °F.
– Base material temperature at time of installation:
HIT-V, HAS, HIS, Rebar: between -10 °C and 40 °C / 14 °F and 104 °F.
HIT-Z: between +5°C and 40°C / 41°F and 104°F.
– Conditions for transport and storage: Keep in a cool, dry and dark place between 5 °C and 25 °C
/ 41 °F and 77 °F.
– For any application not covered by this document / beyond values specifi ed, please contact Hilti.
– Partly used foil packs must remain in the cassette and has to be used within 4 weeks. Leave the
mixer attached on the foil pack manifold and store within the cassette under the recommended
storage conditions. If reused, attach a new mixer and discard the initial quantity of anchor adhesive.
WARNING
! The surface of the HIT-Z anchor rod must not be altered in any way.
! Improper handling may cause mortar splashes.
– Always wear safety glasses, gloves and protective clothes during installation.
– Never start dispensing without a mixer properly screwed on.
– Attach a new mixer prior to dispensing a new foil pack (ensure snug fi t).
– Use only the type of mixer (HIT-RE-M) supplied with the adhesive. Do not modify the mixer in
any way.
– Never use damaged foil packs and/or damaged or unclean foil pack holders (cassettes).
! Poor load values / potential failure of fastening points due to inadequate borehole cleaning.
– The boreholes must be free of debris, dust, water, ice, oil, grease and other contaminants prior
to adhesive injection.
– For blowing out the borehole – blow out with oil free air until return air stream is free of
noticeable dust.
– For fl ushing the borehole – fl ush with water line pressure until water runs clear.
– For brushing the borehole – only use specifi ed wire brush. The brush must resist insertion into
the borehole – if not the brush is too small and must be replaced.
! Ensure that boreholes are fi lled from the back of the borehole without forming air voids.
– If necessary use the accessories / extensions to reach the back of the borehole.
– For overhead applications use the overhead accessories HIT-SZ and take special care when
inserting the fastening element. Excess adhesive may be forced out of the borehole. Make
sure that no mortar drips onto the installer.
! Not adhering to these setting instructions can result in failure of fastening points!
Printed: 08.07.2013 | Doc-Nr: PUB / 5084556 / 000 / 03
Hilti HIT-HY 200-A
en
27

Werbung

loading