Herunterladen Inhalt Inhalt Diese Seite drucken

Palazzetti Sunny Fire Bedienungs- Und Wartungsanleitung Seite 32

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 50
6 INSTALLATION
6.1
ASSEMBLY DIAGRAM
Fig. 6.1 illustrates an example assembly diagram.
• For proper installation, the smoke ducting between the
replace and the ue must have all joints sealed using
material suitable for high temperatures.
• If the replace is installed on a ue used previously with
other replaces, it is necessary to clean thoroughly to
avoid abnormal functioning and prevent a re due to
the combustible materials which deposit on the walls
of the ue pipe.
• Installation requirements include installation of a heat
recovery grille as close as possible to the ceiling
(around 20 cm) with a minimum cross section of 400
cm
.
2
• Incorrect installation may compromise safety of the
unit.
• The cladding must be made of reproof material.
• If there are ammable structures or materials on the
back of the rebox, the distance from the combustible
materials must be 10 cm.
• All combustible materials must be placed at least 80
cm away from the area where heat radiates from the
glass door. (Fig. 6.2).
80 cm
A
B
A) SEAL
B) EXTERNAL AIR INTAKE (UNDER FIRE BED)
C) HEAT RECOVERY GRILLE
D) COUNTER-HOOD AND FIREPROOF LOAD BEARING
STRUCTURE
E) CLADDING IN CERAMIC FIBRE OR ROCK WOOL WITH
EXTERNAL ALUMINIUM FOIL
F) SHIELD THE WOOD PARTS WITH FIREPROOF MATERIAL
G) MINIMUM DISTANCE 5 mm BETWEEN CLADDING AND
FIREPLACE STOVE
- 6.2 -
C
D
E
F
G
H
- 6.1 -

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis