Herunterladen Inhalt Inhalt Diese Seite drucken

Lelit PG1 Handbuch Seite 5

9 l, 3000w
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 7
PG1
COMPONENTS:
1.
Safety cap
2.
Wand to hold the monohose up
3.
on/off switch "Iron 1"
4.
on/off switch "Iron 2"
5.
Boiler switch
6.
Low water indicator light
7.
Power cord (230V)
8.
Regulator for steam outlet
IMPORTANT:
Before the arrival of the steam generator, prepare near the place where it will be installed:
1) a water tank with the necessary capacity (2 steam iron use up about 2 liters of water per hour)
2) a sheltered socket suitable for PG1 power
USER INSTRUCTIONS:
1.
Before using the item, take it off from the packing box and make sure to remove all the packing components
and the protective bags.
2.
Lay the item on a steady and flat surface nearby a wall-socket (1,5 mt maximum).
3.
Connect the optional accessory's plug (iron, steam brush, and so on) into the socket (9) and the accessory's
steam hose into its brass "L" connector (12) and fix it by a hose-clip band. Repeat the same operation with
the second socket and the second "L" connector, if it is necessary to connect two accessories at the same
time. Put the supplied wand in the right seat (2) and hook the steam hose and the cable.
4.
Before beginning any operation, make sure that the tap placed on the side is closed and the "L" joint is
screwed with the outlet downwards.
5.
Unscrew the cap (1) and fill the boiler with max. 7 liter water, pay attention not to make the water overspill,
and close the cap (1); otherwise fill the water as described at point 8.
6.
Connect the supply plugs to a protected socket with earth protector switch, with observance of the law in
force and a voltage suitable to PGAUTO5. Attention: the machine is supplied with 2 power cords at 230v
monophase, one cable for the 2 steam irons (800w*2) and the other cable at 230v monophase for the boiler
(1500w*2).
7.
settle the water filling hoses in a tank full of clean water, make sure that they are completely on the bottom.
One hose is used to fill the water, the other is used to discharge the air entered into the pump each time the
water finished.
8.
if the steam generator has not been filled manually (see point 5), press the switch 13 (or 14) until the water
level reaches the quantity "max" indicated on the front panel near the water level. Attention: if you fill the
boiler beyond the limit "max", the iron might leak some water.
9.
press the boiler switch (5) and the iron switches (3+4) which come on to confirm the start-up.
10.
Set the temperature regulation knob of the iron plate on "cotton" (marked on the knob with "
11.
Wait that the manometer (11) reaches 3,5 bar pressure, it takes about 15 minutes
12.
The machine is ready for use.
13.
Press the steam button of the iron.
14.
It is possible to regulate the steam quantity by the supplied knob (8).
15.
If the steam ends during the ironing and the low water indicator light (5) comes on, this means that the water
in the boiler is finishing (as shown by the water level): to start ironing again, repeat the operation at point 8
and wait until the boiler is under pressure again (the manometer must be set at 3,5 bar). Attention: in order
to shorten the waiting time, we suggest filling water from time to time during the use.
16.
After the starting-up, a pressure decrease could occur; this is caused by the internal hoses' fulfilment of the
machine; in order to get the best steam performance, wait that the manometer is set at 3,5 bar again.
CAUTION!
Avoid to open the lateral cock while the machine is working or connected to the electric net or, in any case, if
-
it is warm or there is still internal pressure.
Clean the boiler every using day (as a suggestion) by opening the discharge tap but only when the machine
-
has been disconnected from the electric net for at least one hour.
Do not leave the machine unguarded if the plug is connected to the net and keep away from children and
-
young people.
Disconnect the plug before spilling water into the tank manually.
-
Do not touch the iron plate during the ironing and 15 minutes after.
-
Do not take off the boiler cap while ironing and check, before taking it off, that there is no steam flow from
-
the iron.
The steam generator cannot be connected to the water pipes, it works with a tank only.
-
Replace the boiler cap only with the original spare part.
-
9.
Accessory socket
10.
Water level indicator
11.
Manometer
12.
"L" connector for steam outlet
13.
Pulse water filling switch
14.
Continuous water filling switch
15.
Discharge tap on the side of the boiler
16.
Water inlet hoses.
English
ooo
").
Pag. 5

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Pg028n

Inhaltsverzeichnis