Herunterladen Inhalt Inhalt Diese Seite drucken

Connections; Monitor Connection; Power Supply Connection - Sanyo VCC-XZ600P Installationsanleitung

Vorschau ausblenden Andere Handbücher für VCC-XZ600P:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Connections

Connections
Coaxial cable

Monitor Connection

• Using different cables from
those specified here may
attenuate the video and/or sync
signals and interfere with
correct transmission.
• RG-59U coaxial cables can be
used when distance between
devices is short, but not in duct
or aerial routing.
Cable type
RG-59U (3C-2V)
RG-6U (5C-2V)
RG-11U (7C-2V)
Connection with a communication device for remote operation
UTP (
Receiver
UTP (
Note:
All connection cables should be 24 AWG or
higher with a maximum length of no more than
600 m (656 yds).
BNC type
Length
250 m (273 yds) max.
500 m (547 yds) max.
600 m (656 yds) max.
+
(SKYBLUE)
)
(PINK)
)
RED
WHITE
1 Push the lever.
2 Insert the cable into the
terminal hole.
3 Release the lever.

Power Supply Connection

b With AC 24 V
For the connections, use cables thicker
than 18 AWG.
b With DC 12 V
Check that +/- polarity is correct.
For the connections, use cables thicker
than 18 AWG.
7
1,3
2
To prevent
electromagnetic
interference
(Installation accessories)
~
~
GND
(+)
(–)
RS485 (A)
Controller
RS485 (B)

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis