Herunterladen Inhalt Inhalt Diese Seite drucken

Step 2: Mounting Vtrak In A Rack; E610F/S - Promise VTRAK E610f Kurzanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 45

Step 2: Mounting VTrak in a Rack

E610f/s

The E610f/s subsystem installs to the rack using the supplied mounting rails. You
can also use your existing rails.
Figure 1. VTrak E610f/s mounted in a rack with the supplied rails
Vertical Rack Post
Handles mount
outside the rack post
To install the E610f/s subsystem into a rack with the supplied mounting rails:
1.
Check the fit of the mounting rails in your rack system. See Figure 2.
2.
Adjust the length of the mounting rails as needed.
At least two persons are required to safely lift, place, and
attach the VTrak subsystem into a rack system.
Do not lift or move the VTrak subsystem by the handles,
power supplies or the controller units. Hold the subsystem
itself.
Do not install the VTrak subsystem into a rack without rails to
support the subsystem.
Only a qualified electrician who is familiar with the installation
procedure should mount and install the VTrak subsystem.
Be sure all switches are OFF before installing the VTrak
subsystem or exchanging components.
Step 2: Mounting VTrak in a Rack
VTrak E610f/s
Mounting rails (included)
mount outside the rack post
Cautions
7

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für Promise VTRAK E610f

Diese Anleitung auch für:

Vtrak e310sVtrak e610sVtrak e310f

Inhaltsverzeichnis