Herunterladen Diese Seite drucken

Valrom Industrie SOFT 10 Montage- Und Bedienungsanleitung Seite 28

Wasserbehandlungssysteme mit ionenaustauschharze

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 57
!
Make sure that there is a gravity flow in the hoses making the connection between overflow, the
connection for wash/regeneration water discharge and the sewage system. Make sure that hoses
are not clogged and that water in the sewage system cannot backwater there at overflow outlet and
the discharge outlet, respectively.
!
Do NOT connect the station directly to 220 V.
2.4 .1 Installation stages of cabinet type systems
(with the resin tank and the salt tank in the same body)
• Set the system in the decided spot while observing the conditions under items 2.1 and 2.2.
• Introduce the connectors in the by-pass ( See figure 6 , page 6, photo 15, 16)
• Connect the supply installation to the station by-pass ( See figure 4, page 5) , at the inlet with „→"
sign oriented towards the station (the treatment station is supplied with a pre-mounted by-pass sys-
tem, the two by-pass connections are with 1" with an exterior thread.
• To connect the pipes to the station by-pass you should use packing materials (teflon etc.)
• Water installation to consumers is connected to the by-pass, on the outlet with „→" sign oriented
towards the station exterior.( See figure 4, page 5)
• Connect the overflow outlet of the station to the sewage system by means of the purchased 12 mm
hose and 12-22 mm collars. ( See figure 5, page 5)
• Connect the regeneration water discharge connection of the station to the sewage system by means
of the 12 mm hose and the 12-22 mm collars. ( See figure 5, page 5)
• Make sure that by-pass is in by-pass position (with valves closed) ( See figure 3, page 5)
Putting into operation:
• During the entire period of installation, the by-pass valves are closed (no water in the station).
• The connection to power supply will be achieved through the 12V transformer to be equipped.
• The control valve panel will be monitored.
• Air is discharged from the station, namely:
- It will be set [Stepwise Regen/Backwashing]: [Menu} is pressed and selection is made using „▼"
up to [Stepwise Regen] and press [SET/REGEN]; ---> [Backwashing]
- A by-pass valve ½ drive is opened from the entry to the station as signalled by an arrow towards
the valve.
- It should be checked whether water flows in the wash/regeneration water discharge hose.
• The by-pass valve from the entry to the station is entirely open, as signalled by an arrow towards
the valve.
• It should be checked whether clean water flows through wash water discharge hose.
• When water is clear [SET] is successively pressed until [SYSTEM RETURN] appears.
• If air is not eliminated or water is not lean, the [Backwash] cycle will be repeated.
• The outlet valve of the station is opened.
• The air cushion is deflated and taken out of the brine vessel, and the vessel is filled with salt and
10 liters of water.
28

Werbung

loading