2.1. Mounting place
□ It should be deprived of freeze and a direct contact with sun rays
□ It should be dry.
□ It should NOT be flooded.
□ Surface should be plane and accommodate the station weight. No station mounting on acclive
surfaces is accepted.
□ It is recommended to be as near as possible to the sewage system.
The hose connected to the station overflow and that connected to the regeneration waters discharge
socket should be as near as possible to a slush trap/pit as discharges through these hoses are
gravitational.
2.2 Mounting conditions (See figure 1, page 4)
□ A mechanical filter of maximum 100 microns should be mounted.
□ It is recommended to mount the station and the mechanical filter on by pass.
□ It is recommended to mount a direction valve after the softening/treatment station that should
prevent water reflux.
□ It is recommended to mount pressure gauges before and after the water treatment system.
□ Only the provided transformer will be used for the electric supply (12V).
□ External consumers (e.g. the valve supplying the irrigation system) are mounted before the
impurities filter and the treatment station with ion exchange resins. (See figure 1, page 4)
2.3 Components necessary for system installation and putting into operation
They are not part of the supply package.
□ Hose with an interior diameter of 12 mm and collars to connect the overflow to the sewage system
and the connection for wash /regeneration water discharge.
□ Salt tablets with a purity of more than 99.5% NaCl. The use of several types of salt may lead to a
resin/filtering agent degradation and system malfunction.
2.4 Stages of station installation
Equipment installation by a specialist is recommended.
Prior to installation please check whether the station is complete and has not suffered any deteriorations
further to handling and transport. If you think that there is anything that is not in order, please contact the
company where from the station was purchased.
For information purposes :
User has the possibility to control water hardness beyond the station. By rotating the mix tank clockwise
water hardness may be increased when exiting the station and if counter clockwise water hardness may
be reduced when exiting the station. (See figure 2, page 5)
In service position valves are open, the entire water flow passes through the station.
In bypass position valves are closed, the water flow does NOT pass through the station, interventions can
be done in the station without any need to cut the water supply. (See figure 3, page 5)
!
Due to the fact that the distance between the sewage system and the station is different, as appro-
priate, the 12 mm hose and the 12-22mm collars are not included, they are procured separately,
as needed.