Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Transport - SEAL 54 Base Betriebsanleitung

Aufzieh- und laminiermaschine
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 70
4.2

Installation

Figure 6: Working space.
1.
Move the machine (and the accessories) to its final location.
2.
Turn down the four leveling feet until the castors are off the floor.
3.
Remove all transport material.
Cut the straps around the shaft supports and remove the foam pads,
Cut the straps holding the in-feed table arms,
Cut the straps around the main roller axis and move up the top main roller to remove the
transport blocks from the nip,
4.
Put a spirit level (horizontal) on the upper main roller and (vertical) against the front of both
cabinets to level the machine by adjusting the four leveling feet.
CAUTION:
Check the mains values before connecting. See section 3.4 for power supply details.
Only if absolutely necessary, use an extension cable of ample capacity. Unroll the
extension cable completely.
5.
Connect the machine to the mains using the power cable supplied with the machine.
WARNING:
MAKE SURE THE POWER SUPPLY CABLE AND/OR THE EXTENSION CABLE
IS NOT BLOCKING YOUR WAY AROUND THE MACHINE.
4.3

Transport

The machine can be transported on a smooth surface on its castors.
CAUTION:
Turn the leveling feet up completely to prevent them from bending or breaking if
accidentally bumping into an obstacle.
When moving the machine on rough surfaces or over long distances, use the original pallet and
packing material and and move it with a pallet truck or forklift.
Installation
Note:
Make sure that the machine, in its final
location, has adequate space. You will
need room to feed, receive and trim
images. See Figure 6.
L = Maximum board length,
S = Minimum space 60 cm.(24").
15

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis