Herunterladen Diese Seite drucken

Grohe 36 264 Handbuch Seite 6

Vorschau ausblenden Andere Handbücher für 36 264:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

GB
Safety notes
• Installation is only possible in frost-free rooms.
• The control electronics are only suitable for indoor use.
• In the case of damage to the external transformer and
controller connection cable, this must be replaced by the
manufacturer or his customer service department or an
equally qualified person, in order to prevent a hazard.
• When cleaning the fitting (of the wash basin) it must be
ensured that the tile frame behind which the electronics are
installed is not sprayed directly with water.
• In order to provide optimum water protection, the tile frame
must be sealed.
• Use only genuine replacement parts and accessories.
The use of other parts will result in voiding of the warranty
and the CE identification.
Application
Wall-mounting box suitable for:
• Direct connection to the water line with cold or premixed
water
Technical data
• Minimum flow pressure:
• Operating pressure:
• Recommended flow pressure:
• Test pressure:
• Temperature:
• Pipe:
• Connection thread:
• Integrated isolating valve
Approval and conformity
This product conforms to the requirements of the
relevant EU guidelines.
The conformity declarations can be obtained from the following
address:
GROHE Deutschland Vertriebs GmbH
Zur Porta 9
D-32457 Porta Westfalica
3
New installations
During installation, please note
• A flexible vacant tube with diameter 25mm is required for the
line between concealed box and wall-mounting box.
• The connectioncables between concealed box and wall-
mounting box have a length about 2m and must not
extended.
• The controller must be easy to access for maintenance
work.
• In order to prevent water running out, route the supply lines
from below with a rise in the last section to the spout, see
fold-out page I, Fig. [1].
• When installing in a suspended ceiling, route the supply
lines with a loop from below to the spout.
1. Prepare the wall for the installation, refer to the
dimensional drawing on fold-out page I.
2. Detach structural shell protection (B), see Fig. [2].
3. Break out openings for pipes, vacant tube, wire to
transformer and fixing holes in wall-mounting box (A).
4. Align wall-mounting box (A) horizontally, vertically and
parallel to the wall and fix in situ, see Fig. [3].
5. Fit structural shell protection (B), see Fig. [4].
6. Put out cable lead-through in concealed box (E), see
Fig. [5].
7. Route cable (D1) through vacant tube (D) to concealed
box (E), see fold-out page II, Fig. [6]. Attach vacant
tube (D) on connection piece of concealed box (E).
8. Fasten structural shell box (F) to concealed box (E) with
screws (G), see Fig. [7].
9. Plaster concealed box (E) beneath the elbow union, see
Fig. [8] and [9]. Observe fitting dimension, see Fig. [9].
0.5 bar
10. Detach structural shell protection (B), see Fig. [10].
max. 5 bar
11. Insert vacant tube (D) in wall-mounting box (A).
1 - 5 bar
12. Insert pipes (H) and (I) in wall-mounting box (A), see
16 bar
Fig. [11].
13. Install isolating valve (J1) with spacer (J) in the pipe.
max. 70 °C
DN 15
Do not solder the connections between the pipes and
G ½
housing, otherwise the built-in isolating valve may be
damaged.
Open isolating valve (J1) and flush pipes thoroughly
(Consider EN 806)!
Close isolating valve (J1).

Werbung

loading