Herunterladen Inhalt Inhalt Diese Seite drucken

Servicing­information - SSS Siedle Steel Produktinformation

Unterputz-türstation mit durchwurfbriefkasten
Vorschau ausblenden Andere Handbücher für Steel:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Installation, commissioning and
programming
All installed function units are com­
pletely pre­assembled in the Steel
system. All that is necessary is con­
nection to the installation.
Installation, commissioning and pro­
gramming are described in the rel­
evant system manual and enclosed
with the line rectifier/server.
5 Disconnect the power at the
existing line rectifier and secure
against switching back on.
6 Connect in accordance with
the relevant circuit diagram.
7 Connect the connecting plugs of
the function units into the matching
colour coded socket on the con­
necting pcb in the flush­mount
housing.
8 Insert the mounting plate
including function units and fix using
the enclosed special screws. Press
lightly against the wall and screw in
position. The mounting plate must
be "level" in the horizontal and ver­
tical direction.
9 Switch the supply voltage back
on again and carry out a function
check.
10 Volume setting
Note: On the Access door loud­
speakers, the voice volume is config­
ured centrally on the Access server.
On all other door loudspeakers, the
volume can be changed using the
plastic key which is inserted in the
inspection shaft cover.
• Set the volume, opening with the
loudspeaker symbol. When setting
the system, if applicable move the
palm of one hand around 5 cm in
front of the grille. This should not
cause any feedback (whistling noise).
8
11 Place the operating panel on the
mounting plate and lock using the
assembly key:
• The locking element on the upper
centring pin must point upward to
attach the operating panel.
• Lock the locking element after
mounting the operating panel.
• Push the locking rails on the left
and right­hand edge downwards.
The marking in the assembly key
must be flush when locked with the
upper edge of the operating panel.
Letter removal door with
viewing window
12 Fit the fully screwed housing
parts so they are flush­mounted
and protrude slightly on the inside
(up to 15 mm).
13 Protect the frame for plastering
work against contamination.
Letter removal door can be
mounted and displaced
Note: This letter removal door can
be installed after the plaster has
been applied.
Protect the pass­through shaft for
plaster work against contamination.
14 Place the rear removal side
with the door open onto the pass­
through shaft and screw on the right
and left.
15 Peel off the double­sided tape for
covering the gap, stick the tape in
the pass­through shaft and carefully
apply pressure.
The adhesive surface must be
located in the shaft. Pay attention
to the mounting position.
Servicing
The operating panel must be
removed for servicing.
16 Measurement points
The measurement points of the
function units which are located
parallel to the terminals are acces­
sible when mounted. The test shaft
is normally installed below the rel­
evant function unit or depending on
space, also next to the function unit
where necessary.
For measurements, the test shaft
cover must be removed. After meas­
uring, replace the test shaft cover.
Exchange a function unit
17 Disconnect the power at the
existing line rectifier and secure
against switching back on.
18 Unscrew the function unit at the
mounting plate, tilt forward at the
top and remove from the mounting
plate. Release the connecting plug.
19 Connect new function unit, insert
and screw to the mounting plate.
20 Switch the supply voltage back
on again and carry out a function
check.
Servicing­Information
Every Steel system is individually
produced and therefore has a
unique customer order number
which is located in three places:
• On the mounting plate
• On the information for the elec­
trical installer
• In the information folder for the
end customer
Please state this customer order
number in connection with all
enquiries, service callouts and spare
part orders.
We have saved all the important
characteristics of your Steel system
under this number. This will facilitate
the troubleshooting process and
ensure that you receive the correct
spare parts.

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis