Herunterladen Inhalt Inhalt Diese Seite drucken

Technical Data Super Finish 21 And 23; Transport; Transport In Vehicle; Starting Operation - WAGNER Super Finish 21 Betriebsanleitung

Airless hochdruck-spritzgerät
Vorschau ausblenden Andere Handbücher für Super Finish 21:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

3.4
tecHnIcAl dAtA
Voltage
Fuse protection
Unit connection line
Socket on unit
Max. connection
Type of protection
Capacity
Max. operating pressure
Max. volume flow
Volume flow at 120 bar
(12 MPa) with water
Max. size of tip
Max. temperature of
the coating material
Max. viscosity
Net weight
Hydraulic filling quantity
Max. acoustic pressure level
*Place of measuring: 1 m in distance from the unit and 1.6 m
above the floor, 120 bar (12 MPa) operating pressure, reverber-
ant floor
3.5

trAnSpOrt

Super Finish 23
Loosen terminal sleeves (fig. 7, item 1) on the shaft ( open).
Extract shaft to the desired length. Deichsel auf Länge nach
Tighten terminal sleeves again by hand ( closed).
1
Super Finish 21 • 23
Super
Super Finish 23
finish 21
110 Volt~,
230 Volt~, 50 Hz
50 Hz
220 Volt~,60 Hz
110 Volt~, 50 Hz
16 A slow-blow
6 m long, 3 x 1.5 mm
230 Volt ~, 50 Hz
220 Volt~, 60 Hz
110 Volt~, 50 Hz
1000 Watt
400 Watt (110 Volt~, 50 Hz)
IP 44
0.96 kW
1.3 kW
250 bar (25 MPa)
2.0 l/min
2.4 l/min
3.0 l/min
(220 Volt~, 60Hz)
1.7 l/min
2 l/min
2.6 l/min
(220 Volt~,60Hz)
0.021 inch–
0.023 inch
0.53 mm
– 0.58 mm
0.027 inch
– 0.69 mm
(220 Volt~,60Hz)
43°C
25.000 mPa·s
26 kg
31 kg
0.9 litre, ESSO NUTO H 22
74 dB (A)*
GB

transport in vehicle

Super Finish 23
Unroll high-pressure hose and lay it over the shaft.
Super Finish 21 und 23
Secure the unit by means of suitable fastening.
4.

StArtInG OperAtIOn

2
4.1

unit with Suction SyStem

1.
Screw off dust protection cap (fig. 8, item 1).
2.
Pay attention to clean sealing areas on the connections.
Pay attention to the fact that the red inlet (2) is inserted into
the coating material inlet.
3.
Screw and tighten the union nut (3) on the suction pipe (4)
onto the coating material inlet (5) with the accompanying
spanner 41 mm.
4.
Screw the union nut (6) on the return pipe (7) onto the
connection (8).
4.2

unIt wItH upper HOpper (5 lItreS)

1.
Screw off dust protection cap (fig. 9, item 1).
2.
Pay attention to clean sealing areas on the connections.
Pay attention to the fact that the red inlet (2) is inserted into
the coating material inlet.
3.
Screw the upper hopper (3) onto the coating material inlet
(4).
4.
Hang the return pipe (5) into the upper hopper.
5.
Screw the union nut (6) on the return pipe (5) onto the
connection (7).
Description of unit/ Starting operation
8
6
7
1
5
2
3
4
31

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Super finish 23

Inhaltsverzeichnis