Herunterladen Inhalt Inhalt Diese Seite drucken

Technical Data Super Finish 21 And 23; Transport; Starting Operation; Unit With Suction System - WAGNER Super Finish 21 Betriebsanleitung

Airless hochdruck-spritzgerät
Vorschau ausblenden Andere Handbücher für Super Finish 21:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Description of unit
3.4 Technical data
Voltage
Fuse protection
Unit connection line
Socket on unit
Max. connection
Type of protection
Capacity
Max. operating pressure
Max. volume flow
Volume flow at 120 bar
(12 MPa) with water
Max. size of tip
Max. temperature of
the coating material
Max. viscosity
Net weight
Hydraulic filling quantity
Max. acoustic pressure level :
* Place of measuring: 1 m in distance from the unit and 1.6 m
above the floor, 120 bar (12 MPa) operating
pressure, reverberant floor

3.5 Transport

Super Finish 23
Push or pull unit.
Loosen terminal sleeves (fig. 7, item 1) on the shaft (L
open). Extract shaft to the desired length.
Tighten terminal sleeves again by hand (R closed).
1
Super Finish 21 • 23
Downloaded from
www.Manualslib.com
Super Finish
Super Finish
21
23
:
230 Volt~, 50 Hz
220 Volt~,60 Hz
110 Volt~, 50 Hz
:
16 A slow-blow
:
6 m long, 3 x 1.5 mm
:
230 Volt ~, 50 Hz
220 Volt~, 60 Hz
110 Volt~, 50 Hz
:
1000 Watt
400 Watt (110 Volt~, 50 Hz)
:
IP 44
: 0.96 kW
1.3 kW
:
250 bar (25 MPa)
: 2.0 l/min
2.4 l/min
3.0 l/min
(220 Volt~, 60 Hz)
: 1.7 l/min
2 l/min
2.6 l/min
(220 Volt~, 60 Hz)
: 0.021 inch
0.023 inch
– 0.53 mm
– 0.58 mm
0.027 inch
– 0.69 mm
(220 Volt~, 60 Hz)
:
43°C
:
25.000 mPa·s
: 26 kg
31 kg
:
0.9 litre, ESSO NUTO H 22
74 dB (A)*
manuals search engine
g
g
Transport in vehicle
Super Finish 23
Unroll high-pressure hose and lay it over the shaft.
Super Finish 21 and 23
Secure the unit by means of suitable fastening.
2

4. Starting operation

4.1 Unit with suction system

1.
Screw off dust protection cap (fig. 8, item 1).
2.
Pay attention to clean sealing areas on the
connections.
Pay attention to the fact that the red inlet (2) is in-
serted into the coating material inlet.
3.
Screw and tighten the union nut (3) on the suction
pipe (4) onto the coating material inlet (5) with the
accompanying spanner 41 mm.
4.
Screw the union nut (6) on the return pipe (7) onto
the connection (8).

4.2 Unit with upper hopper (5 litres)

1.
Screw off dust protection cap (fig. 9, item 1).
2.
Pay attention to clean sealing areas on the
connections.
Pay attention to the fact that the red inlet (2) is in-
serted into the coating material inlet.
3.
Screw the upper hopper (3) onto the coating ma-
terial inlet (4).
4.
Hang the return pipe (5) into the upper hopper.
5.
Screw the union nut (6) on the return pipe (5) onto
the connection (7).
Starting operation
1
5
2
3
4
8
6
7
31

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Super finish 23

Inhaltsverzeichnis