Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
GB
Application
In order to ensure correct operation, a pressure of at least 1.5 bar is necessary at the
shower system.
Caution:
Operation with instantaneous heaters (electrically or gas operated) is not possible.
All thermostats are adjusted in the factory at a flow pressure of 3 bar on both sides.
Should temperature deviations occur on account of special installation conditions,
the thermostat must be adapted to local conditions (see Adjustment).
Specifications
Minimum flow pressure
Max. operating pressure
Recommended flow pressure
Test pressure
Flow rate at 3 bar flow pressure
Handspray
Side showers
Overhead spray
Overhead spray and side showers
Handspray and side showers
Max. water temperature at hot water supply
Recommended max. flow temperature
(energy saving)
Safety stop
Hot water temperature at supply connection
min. 2 °C higher than mixed water temperature
Cold water connection
Hot water connection
If static pressure exceeds 5 bar, a pressure reducing valve must be fitted.
Delivery specification, see fold-out page VII.
Tools required, see fold-out page I.
Installation
Make up unions, if not yet in place.
For union fastening dimensions (cold and hot water connection), see fold-out page II
Fig. [1].
(unions can be located on the left or the right-hand wall).
The hot water supply must be connected above and the cold water supply below.
The installation dimensions for the fitting relate to the standing level of the shower
stand.
The installation height of the showers from the standing
level must be observed in order to comfortably operate
the fittings, see Fig. [1].
• Install union elbows, see Fig.[2].
(the lower union elbow must be installed approx. 20° offset).
• Drill ø6mm fixing holes for fixing brackets, see Fig. [3].
Flush pipes thoroughly
The following dismantling steps must be performed before commencing
installation of the shower system:
Remove fixing screws (B1) and detach cover (B), see Fig. [4].
Please pass these instructions on to the fitting user!
3
The right to make technical modifications is reserved!
Installation of shower system
1.
Install fixing bracket (G), see Fig. [3] and [5].
2.
Hang the shower system on the upper fixing bracket (G) and secure using
washer (G1) and nut (G2), see fold-out page IV Fig. [6].
3.
Pull the shower system away from the wall at the bottom and screw the pressure
hoses (F) with seals (F1) onto the union elbows.
4.
Fix the shower system at the top and bottom using washers (G1) and nuts (G2).
5.
Reinstall upper cover (B), see fold-out page II Fig. [4].
6.
Tighten fixing rings (C) for middle cover (D) using installation aid (A), see
Fig. [7].
7.
Place installation tool (A) on the lower cap (H) for safekeeping and install
cap (H) with screws (H1), see Fig. [8].
1.5 bar
8.
Attach escutcheons (J) to all side sprays, see Fig. [7].
10 bar
2 - 5 bar
9.
Install wall holder (M1) for handspray, (see operating instructions accompanying
wall holder).
16 bar
10. Attach spray hose (L) with seal (L1) to union nipple (K) and install hand
approx. 13.0 l/min
spray (M), see Fig. [9].
approx. 30.0 l/min
(see also enclosed hand spray operating instructions).
approx. 15.0 l/min
11. Insert hand spray (M) in the wall holder (M1).
approx. 37.0 l/min
approx. 35.0 l/min
12. Install overhead spray, see Fig. [10].
80 °C
60 °C
38 °C
Shut-off knob (P) operation, see fold-out page V, Fig. [11].
Shut-off knob in central position
right
Turn shut-off knob clockwise
left
Press button (P3) and
turn shut-off knob anti-clockwise

Adjusting

For temperature adjustment, see Figs. [11] and [12].
1. Open the shut-off knob (P) to the handspray position and measure the
temperature of the water running out using a thermometer, see Fig. [11].
2. With the safety stop depressed, turn thermostat knob (O) until the water
temperature reaches 38 °C.
3. Lever out cap (O1), see Fig. [12].
4. Hold thermostat knob (O) in this position and remove screw (O2).
5. Pull off thermostat knob (O) and reinstall in such a way that the mark
on the knob aligns with the 38 °C lettering on the cover (D).
6. Hold thermostat knob (O) and reinstall screw (O2).
7. Refit cap (O1).
Temperature limitation
The safety stop limits the temperature range to 38 °C. If a higher temperature is
required, the 38 °C limit can be overridden by depressing the safety stop.
= closed
= aperture to handspray
= aperture to overhead spray

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Aquatower 27 202Aquatower 27 200

Inhaltsverzeichnis