Herunterladen Inhalt Inhalt Diese Seite drucken

Guide; Saw Belt; Motor; Extended Maintenance (After Approx. 50 Operating Hours) - EFA SB295E Originalbetriebsanleitung

Halbierungssäge
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

7.2.2 Guide

Ensure particularly careful servicing of the
guide. Readjust in due time or immediately
replace if worn out.
Check that the guide moves freely through the
spring and grease the guide.

7.2.3 Saw belt

Check saw belt regularly, replace if worn out.

7.2.4 Motor

Use a blunt, non-metal object to clean the
condensation water outlets drilled into the
bottom of the motor. Larger amounts of
condensation water accumulating in the motor
will provoke motor failure (corroded winding)
and high costs of repair.
7.3 Extended maintenance
(after approx. 50 operating
hours)

7.3.1 Splitting saw

Check and re-grease ball races of guide
pulleys as necessary.

7.3.2 Guide

Slightly grease both guides.

7.3.3 Tightening torque wrench

At weekends, immerse the Tightening torque
wrench in an oil bath, do not relubricate.

7.3.4 Gearbox

The gearboxes are sealed for life. Lubrication
only needs to be replaced after repairs.
7.4 Repair by After-Sales
Service
Disconnect the unit from the
works mains before starting
any repair work!
Repairs may only be carried out by
authorised specialists.
Our Service department is at your disposal
for all repair work. In the event of a repair,
please contact your nearest contract
workshop or our parent company directly.
Please note that electric tools may only be
Schmid & Wezel
repaired by qualified electricians as
incorrectly performed repairs can result in
considerable danger for the user.
On request, spare parts lists can be
supplied to the repair workshop with
qualified specialist staff.
After every repair, the gear units must be
repacked with grease!

Transport and Storage

8.
The unit must be stored in a dry, well-
ventilated room.
Clean the machine as detailed in section
"Cleaning the splitting saw"
before dispatching it for transport.
Ensure that the unit is not damaged during
transport.

Collection of Old Units

9.
At the end of their useful service life, return
old units to the parent company for disposal.
Page
51 of 72
7.1.2
and allow to dry
Version
11 / 2011

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Sb295elSb295esSb295els

Inhaltsverzeichnis