Herunterladen Inhalt Inhalt Diese Seite drucken

Target Group; Standard Delivery - STIEBEL ELTRON EM Meter Installationsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

2.

Target group

The actions described in this document may only be carried out by
contractors with the following qualifications:
- Training in the installation and commissioning of electrical
equipment
- Training in electrical hazards and local safety regulations
- Knowledge of the relevant standards and guidelines
- Knowledge and observance of this document with all safety
instructions
3.

Standard delivery

- 1 x EM Meter
- 1 x installation instructions
- 2 x connection plugs for RS485 interface
Note
Operation of the serial interface is not intended or required
for correct use.
f Keep the connection plugs for possible future changes
f
or extensions.
Additional material required (not included in the standard deliv-
ery):
- For connection via LAN:
1 x network cable
EM Meter
| 29

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis