2.
Target group
The actions described in this document may only be carried out by
contractors with the following qualifications:
- Training in the installation and commissioning of electrical
equipment
- Training in electrical hazards and local safety regulations
- Knowledge of the relevant standards and guidelines
- Knowledge and observance of this document with all safety
instructions
3.
Standard delivery
- 1 x EM Meter
- 1 x installation instructions
- 2 x connection plugs for RS485 interface
Note
Operation of the serial interface is not intended or required
for correct use.
f Keep the connection plugs for possible future changes
f
or extensions.
Additional material required (not included in the standard deliv-
ery):
- For connection via LAN:
1 x network cable
EM Meter
| 29