Herunterladen Inhalt Inhalt Diese Seite drucken

Panasonic ADC0309H3E5B Installationsanleitung Seite 17

Air-to-water hydromodule + tank
Vorschau ausblenden Andere Handbücher für ADC0309H3E5B:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 225
WARNING
This section is for authorized and licensed electrician/water system
installer only. Work behind the front plate secured by screws
must only be carried out under supervision of qualifi ed contractor,
installation engineer or service person.
Network Adaptor 6 Installation (Optional)
1. Remove the Control Board Cover 3, then connect the cable
included with this adaptor to the CN-CNT connector on the
printed circuit board.
Pull the cable out of the Tank Unit so that there is no pinching.
Connect the CN-CNT connector to Optional PCB 5.
Connection examples: H series
2. Insert a fl at head screwdriver into the slot on the top of the
adaptor and remove the cover. Connect the other end of the
CN-CNT cable connector to the connector inside the adaptor.
Slot
3. On the wall near the Tank Unit, attach the adaptor by
screwing screws through the holes in the back cover.
4. Pull the CN-CNT cable through the hole in the bottom of the
adaptor and re-attach the front cover to the back cover.
CN-CNT cable
Connector
Screws
CN-CNT cable
(Take care not to
pinch the cable)
5. Use the included cord clamp to fi x the CN-CNT cable to the
wall.
Pull the cable around as shown in the diagram so that external
forces cannot act on the connector in the adaptor.
Furthermore, on the Tank Unit end, use the included cable tie to
fi x the cables together.
Cord clamp
Cable tie
17

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis