Herunterladen Inhalt Inhalt Diese Seite drucken

Start-Up; Maintenance; Disposal - Grundfos Liftaway C Montage- Und Betriebsanleitung

Vorschau ausblenden Andere Handbücher für Liftaway C:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 11

10. Start-up

1. Check that all pipes and connections are tight.
2. Fill water from one of the connected units into the
tank, and check that the pump starts.
If the pump starts, the lifting station is ready for
use.
If the pump does not start, check that the lever
arm and the float switch have been fitted correctly
and can move freely.
See section Fault Finding Chart in the installation
and operating instructions for the pump.

11. Maintenance

Liftaway C 40-1 with a Unilift KP pump is practically
maintenance-free. However, regular checks and
cleaning will ensure faultless operation and a long
operating life.
To prevent unnecessary pumping, it should be
checked that the connected units are tight.
For pump maintenance, see installation and
operating instructions for the pump.
Cleaning the tank
For systems which are used very rarely,
we recommend occasional, internal cleaning.
Warning
Before opening the tank, make sure
that the power supply to the pump has
been switched off and that it cannot
accidentally be switched on.
When the tank has been emptied, the pump must be
vented. See step 8 in section 9. Mounting and
venting of pump.
Cleaning the units connected
After cleaning the units connected, flush the lifting
station once more with clean water.

12. Disposal

This product or parts of it must be disposed of in an
environmentally sound way:
1. Use the public or private waste collection service.
2. If this is not possible, contact the nearest
Grundfos company or service workshop.
10
Subject to alterations.

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis