Herunterladen Inhalt Inhalt Diese Seite drucken

Test Operation - Panasonic CZ-RTC5 Einbauanleitung

Vorschau ausblenden Andere Handbücher für CZ-RTC5:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 40

Test Operation

Preparation: Turn on the circuit breaker of units and then turn the power on. The
remote controller starts, and wait until the [Assigning] display disappears.
(If [Assigning] continues to blink for 10 minutes or more, check the
address setting of indoor units.)
1
Press and hold the 3 buttons for
4 seconds or more simultaneously.
,
, ►
2
Select [Test run].
▲ ▼ →
3
Select [ON].
(The unit enters the test
operation mode. Then, [TEST] turns on.)
▲ ▼ →
Press
.
4
Perform the test operation.
5
Finish the test operation.
Perform step 1 and 2, and then select [OFF] in step 3. ([TEST] display
disappears.)
 Any of the Heat, Cool and Fan operations can only be performed.
 Temperature cannot be changed.
 The test operation mode is automatically turned off in 60 minutes. (To prevent continuous
test operation)
 Outdoor units do not operate for approx. 3 minutes after the power is turned on or
operation is stopped.
Attention
 Do not use this mode for purposes other than the test operation. (To prevent
overload of the units)
 Read the installation instructions supplied with the units.
15
(EN)

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis