Herunterladen Inhalt Inhalt Diese Seite drucken

Installation (All Models); Water Connection; Very Important; Steam Connection - Fagor LA-11 Allgemeine Hinweise Zur Installation

Vorschau ausblenden Andere Handbücher für LA-11:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 45

7.1. Water connection

If only cold water is available, connect as shown in figure 3. Where hot water is available, connect as shown in figure
4. If, in addition, decalcified water is available, connect as shown in figure 5
Fig. 3
A=Stopcock B=Filter C=Hose A.C.=Hot water A.F.=Cold water A.D.=Decalcified water
VERY IMPORTANT: Bleed water circuit prior to installation and fitting filters.

7.2. Steam connection

If steam is available, the water will be heated by direct injection.
The connection diagram is shown in the figure.
VERY IMPORTANT: Bleed steam circuit prior to installation and fitting filters
After steam has been introduced into the machine for the first time, it is advisable for the steam hose nuts to be re-
tightened.

7.3. Drainage

Fix the drainage bend pipe as shown in the figure

7. INSTALLATION (ALL MODELS)

Fig. 4
Required dynamic pressure: 2 ÷ 4 Kg/cm
A=Stopcock
B=Filter
Steam pressure: 2 ÷ 4 Kg/cm
A= Drainage pipe bend
B=Clamp
2
.
Failure to fit the filters on the water and steam
inputs will result in loss of cover under
guarantee for the corresponding components
2
.
6
ENGLISH
Fig. 5
Warning!

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis