Herunterladen Inhalt Inhalt Diese Seite drucken

Bosch BPT-S 4.6 Betriebsanleitung Seite 185

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
English
NOTICE
Bosch Power Tec GmbH
6. Connect the wires to the contact carrier. For the
terminal assignment (PE, L, N), see the drawing.
Tighten the screws on the contact carrier using a
slotted screwdriver (blade width 4 mm)
(tightening torque: 0.8 to 1 Nm).
Wires (1), contact carrier (2): Terminal assignment
5.7:
(3)
Material damage due to failure to observe the
specified tightening torques
Insufficient tightening torque can cause the cable to
be pulled out of the plug. Excessive tightening torque
can break the cable at the contact or the plug. In both
cases (too low, too high), this can result in a short
circuit, fire or device failure.
Tighten the cable to the specified tightening torque.
Tighten the screw connection to the specified
tightening torque.
7. Check that the wires are completely inserted and
connected.
8. Insert the contact carrier into the housing until the
contact carrier audibly clicks into place on both
sides.
(1)
Bosch BPT-S 3 / 3.68 / 4 / 4.6 | Operating manual
Installation | 67
(2)
(3)
N
L
PE

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Bpt-s 3.68Bpt-s 3Bpt-s 4

Inhaltsverzeichnis