32 | Technical description
Bosch BPT-S 3 / 3.68 / 4 / 4.6 | Operating manual
(1)
3.6:
Connection area
[1]
DC+ connection, solar generator
[2]
DC- connection, solar generator
[3]
Service switch position 0: Solar generator
disconnected from the string inverter. Switch
position 1: String inverter ready for operation,
connects to the solar generator
[4]
Ethernet Direct connection to PC and router or
switch
[5]
Pressure equalization element Element for
pressure equalization in the inverter housing
[6]
Separate PE connection Earth connection for
separate earthing
[7]
AC connection Grid connection
Symbol
DC
LAN
PE
(2) (3)
(4)
Code designation
Explanation
DC
Direct current
LAN
Ethernet
connection
PE
Earthing
English
(5) (6) (7)
Bosch Power Tec GmbH

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Bpt-s 3.68Bpt-s 3Bpt-s 4