Herunterladen Inhalt Inhalt Diese Seite drucken

Sundirect PE-Plus Installations- Und Bedienungsanleitung Seite 9

Infrared panel heater
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 12
5.5 Mounting installation for IC-Plus/GD-Plus/MD-Plus series
The kit supplied in the package is designed for the mounting on a solid wall/ceiling.  If mounted
onto other types of wall/ceiling, you will need appropriate fixings (not supplied). Please make sure
the wall/ceiling is safe to mount. We highly recommend to have the panel installed by a qualified
electrician or installer authorized by Sundirect.
Please note that GD-Plus/MD-Plus series are designed only for wall mounting, don't mount them
on the ceiling.
1
3
5
2
WALL
CEILING
4
WALL
CEILING
6
WALL
CEILING
WALL
CEILING
WALL
CEILING
WALL
CEILING
9
Step 1. Use the supplied
mounting bracket to mark the
position of the holes on the
wall/ceiling. For vertical wall
mounting, "A" signal will be
the top of the mounting
bracket. For horizontal wall
mounting "B" signal will be
the top of the mounting
bracket. 
Step 2. Drill holes using a
8mm drill.
Step 3. Insert the dowels into
the holes.
Step 4. Screw the screws into
the dowels through the holes
on the mounting bracket.
Step 5. Mount the panel on
the mounting bracket.
Step 6. Move the panel into
two directions to make sure
the panel is secured.

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis