Herunterladen Inhalt Inhalt Diese Seite drucken

Noise Pollution; Installation And Start-Up; Installing The Guard Plates (02, 03, 04); Installing The Hand Grip - AL-KO MT 36 Li Betriebsanleitung

Vorschau ausblenden Andere Handbücher für MT 36 Li:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

Installation and start-up

Take sufficient work breaks. Without suffi-
cient breaks, a hand/arm vibration syndrome
can occur.
The load factor (which depends on the work
performed or the use of the device) should be
assessed and appropriate breaks taken. This
significantly decreases the load factor
throughout the whole working period.
Minimise your risk of being exposed to vibra-
tions. Maintain the appliance according to the
instructions in the operating instructions.
If the device is used frequently, contact your
dealer and obtain anti vibration accessories if
necessary (e.g. grips).
Avoid working with the device at temperat-
ures below 10 °C. Define how the vibration
load can be limited in a work plan.
3.7.3

Noise pollution

A certain level of noise exposure from this device
is inevitable. Carry out noisy work at approved
and specified time periods. Observe rest periods
as necessary and restrict the duration of the work
to a minimum. For your personal protection and
protection of persons in the vicinity, appropriate
hearing protection must be worn.
4 INSTALLATION AND START-UP
WARNING!
Danger of cutting injuries
Danger of cutting injuries when reaching
into sharp-edged, moving appliance parts
and into cutting tools.
Before maintenance, care and clean-
ing work, always switch off the appli-
ance. Remove the rechargeable bat-
tery.
Always wear protective gloves during
maintenance, care and cleaning
work.
4.1

Installing the guard plates (02, 03, 04)

Attach the main plate (02)
1. Insert (02/a) the main plate (02/1) on the cut-
ter head (02/2).
2. Hook (02/b) the fastening clip (02/3) and
screw in (02/c) the fastening screw [M6]
(02/4).
442105_a
Attach the front guard plate (03)
1. Place both halves (03/1, 03/2) of the front
guard plate on the cutter head and push to-
gether (03/a). The edge of the front guard
plate has to be located under the main plate.
2. Screw in (03/b) both screws [ST4*16] (03/3).
Insert the protective ring with line cutter (04)
1. Position the protective ring (04/1) in such a
way above the guard plate (04/2) that the line
cutter (04/3) points inwards towards the cut-
ter head (04/4).
2. Pushing in the protective ring:
First press (04/a) the two long pins (04/5)
exactly in the second compartment
(04/6).
Note: If one of the two pins is pressed in
one of the neighbouring compartments,
the protective ring is not tight enough.
Then press all latching hooks (04/7) from
left to right in the holding openings (04/8)
until they are all engaged (04/b).
4.2

Installing the hand grip

See operating instructions of the basic appliance.
4.3

Fitting the spacer (05)

1. Screw (05/a) spacer (05/1) on the rotating/
locking joint (05/2) of the already mounted
hand grip (05/3).
4.4
Removing/fitting the spool
head (06, 07, 08)
Mounting the line head
1. If fitted: Remove the blade (see chapter 4.5
"Fitting/removing the blade (09, 10)",
page 24).
2. Insert the retaining pin supplied (06/1) into
the hole (06/2) of the drive pulley (06/3) and
hold.
3. Put the filling washer (06/4) onto the drive
shaft (06/6) with the front edge (06/5) to-
wards the outside, i.e. away from the cutter
head (06/7).
4. Put the spool head (07/1) onto the drive shaft
of the cutter head (07/2).
5. Turn the spool head (08/1) clockwise and
then firmly tighten. Brace with the retaining
pin (06/1) to attach the spool head safely to
the drive shaft (08/a).
6. Remove the retaining pin (06/1).
23

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Bca 36 li

Inhaltsverzeichnis