Herunterladen Inhalt Inhalt Diese Seite drucken

Building Into A New Hearth - Dovre VISTA 700i Einbauanleitung Und Gebrauchsanweisung

Vorschau ausblenden Andere Handbücher für VISTA 700i:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 92
A
B
C
D
E
F
G
H
A
Flue
B
Connection piece
C
Connection pipe
D
Existing hearth
E
Fireproof wall
F
Ventilation space (minimum 15 mm)
G
Outside air connection (back)
H
Outside air connection (underneath)
I
Convection air opening
J
Convection air opening
K
Convection air intake opening (front)
L
Existing floor
M
Convection air intake opening (underneath)

Building into a new hearth

The fireplace insert is installed in two stages:
Subject to change because of technical improvements
I
J
K
L
M
09-20021-230
Placing and connecting the fireplace
Building up the hearth around the fireplace.
Placing and connecting the fire-
place insert
1. Place the appliance at the proper height, flat and
level.
2. If you are going to put an outsider frame around the
appliance, you should fit the included magnets to
the sides of the appliance; see the following figure.
1
2
3. Check that there is at least 15 mm of free con-
vection space between the existing walls – which
must have the necessary insulation (see chapter
"Installation Conditions") – and the back of the
appliance.
4. The masonry should not rest on the fireplace. If
required, use a support such as a steel beam.
Leave a clearance of at least 3 mm between the
support and the appliance.
4. Connect the appliance to the flue hermetically.
5. Check the draught in the flue and the seal of the
connection on the flue gas duct by making a small,
intense trial fire with newspaper and dry, small
kindling.
If there is new masonry then wait until the
masonry has dried sufficiently.
09-200021-231
13

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Vista 800i

Inhaltsverzeichnis