Herunterladen Inhalt Inhalt Diese Seite drucken

Commissioning, Operation; Specifications - WIKA PG43SA-C Zusatzinformation

Vorschau ausblenden Andere Handbücher für PG43SA-C:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

5. Commissioning, operation / 9. Specifications

5. Commissioning, operation

5.5 Commissioning and operation
EN
For pressure compensation, open the vent valve for a short time and
then close it again directly, see chapter 2.3.
The vent valve remains closed during operation.
Only through a brief venting of the case before each
pressure measurement can the pressure be read correctly.
5.7 Autoclaving
Ensure that, before the start of the autoclaving process, the vent
valve has been closed.
Carry out the autoclaving process. For performance limits see
chapter 9 "Specifications".
Allow the instrument to cool to ambient temperature.
By briefly opening the vent valve, the pressure difference between
the atmosphere and the sealed case will be eliminated.

9. Specifications

Permissible temperature
Autoclaving
Ingress protection per IEC/EN 60529
IP68 (only with closed vent valve)
4
≤ 134 °C, ≤ 20 minutes
WIKA additional information PG43SA-C, autoclavable version

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis