�4 | ��M�� T�S �� ��� M��� | First start up
4.

First start up

4.1
�npacking
1. Remove the packaging paying attention to nails
detaching.
i
After unpacking check the integrity of
JUMBO TCS 52 ANW MAXI and check that no compo-
nents are visibly damaged. In case of doubt do not
proceed to start-up and contact a qualified technici-
an and/or your vendor.
2. Take out of the transport crate the standard accesso-
ries and the packaging materials.
i
Dispose correctly of packaging material, hand it over
to the designated collection points.
4.�
�nstallation
4.�.1

Machine positioning

1. Insert the appropriate lifting belts (length belt 1: 1.5
Mt, belt 2: 2 Mt), with sufficient capacity, as shown.
�arning - tilting danger!
The barycentre of the
JUMBO TCS 52 ANW MAXI is not in its centre.
It is necessary to lift the machine slowly.
|
1 695 301 960
2011-07-16
2. Lift the JUMBO TCS 52 ANW MAXI with a lift crane
and install it in the chosen area respecting the mini-
mum distances shown in the picture.
i
For safe and ergonomic use of the
JUMBO TCS 52 ANW MAXI it is recommended to
leave a minimum of 750 mm space from the nearest
wall and of 900 mm from the ceiling.
�arning - tilting danger!
During tire inflation considerable forces are
exerted.
The JUMBO TCS 52 ANW MAXI has to be
JUMBO TCS 52 ANW MAXI has to be
fixed in at least 3 points on the floor.
has to be