Herunterladen Inhalt Inhalt Diese Seite drucken

Pre-Installation Planning; Equipment Required For Installation; Site Planning - Maxtor MaxAttach NAS 4100 Anleitung

Vorschau ausblenden Andere Handbücher für MaxAttach NAS 4100:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 48

1 Pre-Installation Planning

Equipment Required for Installation

To connect, install and administer your MaxAttach NAS 4100, you will need an available 10/100
Ethernet network hub or switch. It will be necessary for your workstation to have the following
capabilities:
• Windows 95/98/Me/NT (SP5)/2000
• Internet Explorer v4.01 SP1 or newer - support for Netscape is not currently available.
• Client for Microsoft Networks enabled over TCP/IP.
• Network Interface Card (NIC)
• CD-ROM Drive

Site Planning

When planning a site to house your MaxAttach NAS 4100, you will want to consider requirements
for power and network availability, as well as a space with well regulated temperature and humidity
that is relatively free of dust and other air-born contaminants. If your installation calls for placement
on a table top, apply the enclosed rubber feet to the bottom of the chassis.
The following tables are designed to help you plan your MaxAttach NAS 4100 installation.
Table 1-1. Size & Weight
Item
Weight
Size
CAUTION: When placing your MaxAttach in rack mount mode, make sure you
Pre-Installation Planning
27 pounds (12.3 kg)
17 x 20 x 1.75 (43.2 x 50.8 x 4.5 cm)
maintain proper mechanical load leveling to avoid a hazardous condition.
Quantity
1

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis