Herunterladen Inhalt Inhalt Diese Seite drucken

Purging Air And Checking Gas Leakage - Daikin ARX20K5V1B9 Installationsanleitung

Split-baureihe r410a
Vorschau ausblenden Andere Handbücher für ARX20K5V1B9:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 16
Outdoor Unit Installation
5.

Purging air and checking gas leakage.

• When piping work is completed, it is necessary to purge the air and check for gas leakage.
WARNING
1) Do not mix any substance other than the specified refrigerant (R410A) into the refrigeration cycle.
2) When refrigerant gas leaks occur, ventilate the room as soon and as much as possible.
3) R410A, as well as other refrigerants, should always be recovered and never be released directly into the environment.
4) Use a vacuum pump for R410A exclusively. Using the same vacuum pump for different refrigerants may damage the vacuum
pump or the unit.
• If using additional refrigerant, perform air purging from the refrigerant pipes and
indoor unit using a vacuum pump, then charge additional refrigerant.
• Use a hexagonal wrench (4mm) to operate the stop valve rod.
• All refrigerant pipe joints should be tightened with a torque wrench at the specified
tightening torque.
1) Connect projection side of charging hose (which comes from gauge manifold) to gas stop valve's service port.
2) Fully open gauge manifold's low-pressure valve (Lo) and completely close its high-pressure valve (Hi).
(High-pressure valve subsequently requires no operation.)
3) Do vacuum pumping and make sure that the compound pressure gauge reads –0.1MPa (–76cmHg)*1.
4) Close gauge manifold's low-pressure valve (Lo) and stop vacuum pump.
(Keep this state for a few minutes to make sure that the compound pressure gauge pointer does not swing back.)*2.
5) Remove caps from liquid stop valve and gas stop valve.
6) Turn the liquid stop valve's rod 90 degrees counterclockwise with a hexagonal wrench to open valve.
Close it after 5 seconds, and check for gas leakage.
Using soapy water, check for gas leakage from indoor unit's flare and outdoor unit's flare and valve rods.
After the check is complete, wipe all soapy water off.
7) Disconnect charging hose from gas stop valve's service port, then fully open liquid and gas stop valves.
(Do not attempt to turn valve rod beyond its stop.)
8) Tighten valve caps and service port caps for the liquid and gas stop valves with a torque wrench at the specified torques.
*1. Pipe length vs. vacuum pump run time.
Pipe length
Run time
*2. If the compound pressure gauge pointer swings back, refrigerant may have water content or a loose pipe joint may exists. Check
all pipe joints and retighten nuts as needed, then repeat steps 2) through 4).
6
Up to 15 metres
Not less than 10 min.
Compound
Pressure
pressure gauge
meter
Gauge
manifold
Liquid
stop
valve
Valve caps
High-
Low-pressure
pressure
valve
valve
Charging
hoses
Vacuum pump Service port
Gas stop valve
English

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Arx25k5v1b9Arx35k5v1b9

Inhaltsverzeichnis