Herunterladen Diese Seite drucken

Werbung

and (2241) (4.7) and allow one of the extra
bolts in (2240) and (2241) to slide into the
open hole in corner angle (2315/2316) (4.7).
Note: Position (2240) and (2241) using the
locating edge on (2315/2316).
Place pane D into the guide in horizontal bar
(2237) and assemble onto (2240 and (2241)
(4.8) ensuring correct fitting into (2248) and
(2249)
.
Connect door guide bar (2251) to horizontal
bar (2237) loosely from the outside with two
nuts and bolts
.
Depending on which direction the door should
open, align the door guide bar (2251) to the
left or to the right.
5. ROOF ASSEMBLY
[Eos 6000 & 7500:
Assemble parts (2320) / (2321) together using
connecter (2229) and 8 nuts and bolts (5.1).
Note: The 4 inside nuts and bolts should only
be connected loosely.
Slide part (2228) (5.2) over the join between
the ridge bars.
]
Connect the assembled ridge bar (2320 -
2326) onto roof corner bars (2240) and (2241)
by sliding the prepared extra bolts into the
open hole in the ridge bar (5.3).
Insert 1 extra bolt to connect roof brace (1056)
into each roof middle bar (2242) (5.7) and
(2243) (5.8).
On two adjacent roof bars insert 1 extra bolt to
connect roof vent sill bar (2360) in step 6.
Please repeat this at a second
[
Eos 6000 & 7500:
location.
]
Include 1 extra bolt adjacent to that
[
Eos 3100:
included in (2240) / (2241) in step 3.
Connect roof middle bars (2242) and (2243)
between the eave angle bars, noting the
locating edge (5.4), (5.5) (5.6) and the ridge
bar (5.7) (5.8).
Now position your frame on the prepared
base/foundation and connect loosely. (Please
only tighten these bolts after the house is fully
glazed.) Adjust the frame until it is completely
square and tighten all bolts.
Please do not over tighten (max. 3Nm).
6. SIDE / ROOF GLAZING
Slide eave connecter (2219)
[Eos 6000 & 7500:
into the joining ends of eave bars (2310) or
(2311) (6.2). On both sides of (2219) connect
screw (1006) in the prepared holes (6.2).
Slide panes E into the appropriate guides in
the vertical bars (6.4).
021.01.1109
Slide panes F and G into the appropriate
guides in the roof bars (6.5).
Prepare 4 bolts in each eave bar and connect
to eave angles (2315) or (2316) (6.6) (6.7).
Connect roof vent fixers (6056) to sill bar
(2360) using screws (1006) (6.8). Connect
(2360) in the desired opening for the roof vent
fitting it over the top edge of the assembled
pane G (6.9).
Push spacer (2399) onto the ridge bar, in the
middle of each field, to ensure roof panes F
maintain the correct distance.
7. DOOR
Attention: Do not stand the assembled door
on door gliders (2214) to avoid damaging
them.
Screw (1006) into both sides of door bottom
bar (2255) and then push door gliders (2214)
into both ends (7.2).
Assemble (2252), (2253), (2254) and (2255)
as shown (7.3) (7.4) (7.5).
Slide the panes H into the appropriate guides
in the middle bars and connect door side bar
(2258) (7.6).
Insert door guides (2271) into the top end of
door side bars (2252) and (2258) (7.5).
Slide brush seal (2270) into both side bars
(2252) & (2258) (7.7).
Slide (2214) onto sill bar (2209) and (2271)
]
into door guide bar (2251) as shown.
Cutting brush seal (2270) on the desired side,
use screw (2289) to connect door knob (2285)
as shown.
Connect (2257) to door support bar (2250)
using bolt (2001). Connect (2257) to the end
of (2251) by inserting bolt (1001) in the bolt
channel in (2251) (7.8).
Connect the bottom end of (2250) to corner
bar (2230) by inserting bolt (2001) into the bolt
channel in (2230) (7.9).
Once the door is in place connect nut (1002)
and bolt (2001) into the open end of (2251) as
door stopper.
8. ROOF VENT
Connect roof vent bars (2262) and (2361)
(8.2).
]
Slide pane J into the apropriate guides (8.3)
and connect bottom bar (2363) (8.4).
Attach roof vent opener (1067) using screws
(1006) and place plastic cap (1019) over the
end (8.5).
Position the roof vent in the ridge bar from one
end (8.6) (8.7) (8.8) and slide it to the prepa-
red opening (8.9).
9. SPLIT PANE GLAZING
If your greenhouse is delivered with split
panes then the connecting H-plastic (K) can
be found with the glazing. Please cut them to a
length of 584mm so that they fit between the
aluminium profiles.
FINISHING
If desired, it is possible to seal the greenhouse
at the edges using neutral silicone. Silicone is
not in cluded.
Place the warning label inside the house.
A full range of greenhouse accessories, to
help you make the most of this product, is
available from your stockist. Please inform
yourself as to the possibilities.

SAFETY NOTICE

In the event of high wind conditions, close the
doors and all vents.
In the event of heavy snowfall, clear the roof
of the building or take suitable measures to
support the roof. Heat the building in winter.
COMMENTS
For the complete protection of your new
green house, we advise you to include it in
your house insurance. Please take note
of possible building rules relating to the
positioning of greenhouses.
Please stick the included greenhouse model
label onto door bar (2253) after success fully
assembling this product. This information is
important in the event that replacement parts
are later required.
Please keep these assembly instructions in a
safe place, for future reference!
Our policy is one of continuous improvement
and we reserve the right to change the specifi-
cations without prior notice.
5

Werbung

loading

Diese Anleitung auch für:

Eos 6000Eos 4600Eos 7500