Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 6
bottom of the bolt channel holding brush seals
(5021) and fix it in place using nut (1515) (4.6).
Cut the door seals (5021) to length.
Connect door rollers (1015) to the door bar
(1362) using bolt (1304), washer (1009) and
nut (1007) (4.4).
Now slide the door rollers into the door runner
bar (1373) (4.7). Please ensure that the door
gliders are also running on the bottom track
(4.8).
Adjust the door so that it moves freely.
5. RooF VeNtS
Connect the side bars (1065) and the top bar
(1064) depending on the glass thickness.
Up to 4 mm, see (5.1). For 4 mm and over,
see (5.2).
Place the bolts to connect the bottom bar
(1066) in the prepared holes, and then slide
the glass into the tracks in side bars (1065)
(5.3).
Now connect bottom bar (1066), and ensure
that the window is totally square before
tighten ing all bolts.
Position the window in the ridge bar from one
end (5.4) and (5.5) and slide it to the required
position (5.6).
Connect the window sill (1063) with the extra
bolts in the roof glazing bars (5.7). If the
window is connected in a corner position, then
it is necessary to use bolt (2001), instead of
(1001), on the corner bar.
Bolt the window opener (1067) to the bottom
bar (1066) (5.7) using screws (1006) (5.8).
Place the plastic cap (1019) over the end of
the window opener (5.6) and connect both
window fixers (1016) onto the window sill
(1063) using screws (1006) (5.8).
6. GlazING – PolycaRBoNate PaNeS
Please note the already mentioned safety
precautions.
Important! The UV-resistant side is indicated
by the plastic film and printing at the edge.
this side must face outside.
Remove the film. Note! Completely remove
the film only after the pane has been
positioned in the greenhouse. (The panes are
cut marginally shorter to allow for expansion in
warm conditions).
Press the glazing seals (1020) onto the
aluminium profiles (6.7) (6.8) and cut to length.
Fix the glazing panes in place using the
glazing spring clips (1011) (6.7) and note the
quantity required on each pane.
In order to give the Polycarbonate panes extra
stability, connect them to the aluminium
956.01.2009
profiles, in the middle of each pane, with a Z
profile (6.1 - 6.5) and at the ridge by pushing
spacer (2399) onto the ridge bar (6.6).
FINISHING
If desired, it is possible to seal the greenhouse
at the edges using neutral silicone. Silicone is
not in cluded.
Place the warning label inside the house.
A full range of accessories is available to help
you make the most of this product. Please
contact your local stockist for details.

SaFety NotIce

In the event of high winds, close all doors and
vents.
In the event of heavy snowfall, clear the roof
of the building or take suitable measures to
support the roof. Heat the building in winter.
commeNtS
For the complete protection of your new
greenhouse, we advise you to include it in
your house insurance. Please take note of
possible building rules relating to the
positioning of greenhouses.
Please stick the greenhouse model label
provided onto the door bar (1362) after
successfully assembling this product. This
information is important in the event that
replacement parts are later required.
Please keep these Assembly Instructions in
a safe place, for future reference!
Our policy is one of continuous improvement
and we reserve the right to change the
specifications without prior notice.
5

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Vm9033-f 3800

Inhaltsverzeichnis