Herunterladen Inhalt Inhalt Diese Seite drucken

Commissioning; Getting Ready For Use - Salvis Gas-Char Grill 400 Betriebsanleitung

Profiline
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

en
4.

Commissioning

Initial commissioning
. Before using the appliance for the first time, clean with a cleaning product that dissolves grease.
● Cleaning, refer to page 35, Chapter 6.
4.1

Getting ready for use

Cooking grate
Lava rock
grate
Frame
Collecting
container
32 / 52
● Attention! Do not empty water over the cooking
. Fill the collecting container (gastronormy con­
● The water minimises
Lava rock
appr. 6 kg
. Push in the collecting container.
. During operation, check the collecting con­
. Insert the frame.
. Insert the lava rock grate.
. Replace used lava/glowing rock.
. Uniformly distribute the lava/glowing rock.
. Insert the cooking grate.
. Open the gas tap.
Gas tap
grate or into the collecting tray!
tainer) with water approx. 1 cm deep.
‒ smoke development,
‒ the grilled food from drying out,
‒ with extended use, the adhesion of grilled
food remains.
tainer to see if water must be replenished.
Open
Closed

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Gas-char grill 800Gas-char grill 1200

Inhaltsverzeichnis