Herunterladen Inhalt Inhalt Diese Seite drucken

Operation; Dmx-Controlled Operation; Cleaning And Maintenance - EuroLite DMX SUPERSTROBE 2700 Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für DMX SUPERSTROBE 2700:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Controlling:
After having addressed all devices, you may now start operating these via your controller.

OPERATION

Caution: Before connecting the strobe with the mains, the Intensity-control and the Flash Rate-control have
to be set to minimum position.
After you connected the effect to the mains, the DMX SUPERSTROBE 2700 starts running.
Manual control
When unpacking the strobe, DIP-switch no. 10 may be set to OFF and the device is in DMX-mode. In the
DMX-mode, the flash frequency and the dimming level cannot be adjusted via the rotary control.
For testing purposes, please switch the device to manual control. For doing so, DIP-switch no. 10 has to be
set to ON.
On the rear panel of the DMX SUPERSTROBE 2700 there are two controls to adjust the flash frequency (1-
13 flashes per second) and the dimming level (0-100%).

DMX-controlled operation

You can control the Strobes individually via your DMX-controller. Every DMX-channel has a different
occupation with different features.
DMX protocol
DMX Channel Chart
CH1-FLASH RATE
FAST
255
12fps
MID
128
7fps
SLOW
0
2fps

CLEANING AND MAINTENANCE

The operator has to make sure that safety-relating and machine-technical installations are inspected by an
expert after every four years in the course of an acceptance test.
The operator has to make sure that safety-relating and machine-technical installations are inspected by a
skilled person once a year.
The following points have to be considered during the inspection:
1) All screws used for installing the devices or parts of the device have to be tighly connected and must not
be corroded.
2) There must not be any deformations on housings, fixations and installation spots (ceiling, suspension,
trussing).
3) The electric power supply cables must not show any damages, material fatigue (e.g. porous cables) or
sediments. Further instructions depending on the installation spot and usage have to be adhered by a
skilled installer and any safety problems have to be removed.
CH2-INTENSITY
255
128
16
15
OFF
Figure 1
0
21/43
00025936.DOC, Version 3.5

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis