Herunterladen Inhalt Inhalt Diese Seite drucken

Installation - EuroLite STW-200A Lighting stand Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

INSTALLATION

Please consider the
installation! The installation must only be carried out by an authorized dealer!
When rigging, derigging or servicing the fixture staying in the area below the installation place, on bridges,
under high working places and other endangered areas is forbidden.
The operator has to make sure that safety-relating and machine-technical installations are approved by an
expert before taking into operation for the first time and after changes before taking into operation another
time.
The operator has to make sure that safety-relating and machine-technical installations are approved by an
expert after every four year in the course of an acceptance test.
The operator has to make sure that safety-relating and machine-technical installations are approved by a
skilled person once a year.
Procedure:
IMPORTANT! OVERHEAD RIGGING REQUIRES EXTENSIVE EXPERIENCE, including (but not limited to)
calculating working load limits, installation material being used, and periodic safety inspection of all
installation material and the loads. If you lack these qualifications, do not attempt the installation yourself, but
instead use a professional structural rigger. Improper installation can result in bodily injury and.or damage to
property.
The stand has to be installed out of the reach of people.
Loosen the fixation screws of the legs. Pull the legs out until the cross struts stand at a 90° angle to the legs.
Tighten the fixation screws of the legs.
In case of gravitational displacement or uneven ground surface, the lengthening of one leg corrects the
situation.
Warning: If installing on slippery surfaces, the legs must be secured with screws or nails via the
Loosen the crank handle lock nut and lift the crank handle into place. Tighten the lock nut.
Installation of the adapter
Attach an appropriate adapter or TV-pin (heavy) to the top end of the stand and fasten it with the handle at
the side.
Installation of the luminaires
Caution: The loads have to be installed in a balanced way.
Caution: The carrying capacity of the stand must never exceed 35 kg!
Install the fixtures on the crossbeam and always install a safety-rope that can hold at least 10 times the
weight of the fixture. You must only use safety-ropes with screw-on carabines. Pull the safety-rope through
the hole in the mounting-bracket and over the crossbeam. Insert the end in the carabine and tighten the
fixation screw.
Loosen the crank handle fixation screw. Crank the handle in clockwise rotations until the desired height is
reached. Make sure that the maximum lifting height is never exceeded. Replace the crank handle to its
original position. Tighten the fixation screw very well, if necessary with an appropriate tool. Check to make
sure all fixation screws are properly tightened.
The footstep enables the stand operator to check equipment hanging from the device.
DANGER TO LIFE!
DIN 15560-27
and the respective national norms during the
provided holes!
13/14
60000850_V_1_2.DOC

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis