The modules are operable and combinable in respect
of table above. Combination be not listed are not al-
lowed. These modules have no effect on consumpti-
on recording and can be fitted retrospectively without
damaging the calibration mark. The relevant ESD regulations
(electrostatic discharge) must be observed. No liability is accepted
for damage (especially to electronic circuits) resulting from failure
to comply with the ESD regulations.
6.1 INSTALLATION OF MODULES
1. Open the integrator by releasing the side catches.
2. Click module into selected place and plug bended flat cable
into connector at both sides.
3. Close the lid and check the meter for correct operation by pres-
sing the pushbutton. Renew the label seal of the housing lid if
the meter functions correctly.
Slot 1
Slot 2
Test output