Herunterladen Inhalt Inhalt Diese Seite drucken

Operation; Connection To Test Installation Lines - Metz Kapri plus Bedienungsanleitung

Kabel- und installationstester
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

6. Operation

6.1 Connection to Test Installation Lines

To test an installed line plug one end of the installation line to the
KAPRi plus Mainframe and the other end to the KAPRi plus Test Box.
To do a simultaneous line identification plug one KAPRi plus Test
Box to each termination to be tested (max. 9 Test Boxes, available
as accessories).
KAPRi plus Mainframe
6.2 Connection to Test Patch Cables
Patch Cable
Installation Lines
Patch Panel
Wall Outlets
KAPRi plus Test Boxes
If you want to use the
KAPRi plus for error detec-
tion on patch cables, plug
one end of the patch cable
into the RJ45 jack of the
KAPRi plus Mainframe and
the other end into the RJ45
jack of the KAPRi plus Test
Box.
E8

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis