Mitsubishi Electric PAC-AH125 Installationsanleitung Seite 4

Air handling unit controller
Vorschau ausblenden Andere Handbücher für PAC-AH125:
Inhaltsverzeichnis

Werbung

6
A
[Fig. 6.3.1]
[Fig. 6.3.2]
A
B
G
[Fig. 6.3.3]
B
A
7
[Fig. 7.0.1]
G
CN2M
CN3T
C
H
H
4
B
D
C
D
C
C
SW4
SW7
SW2
A2
T31
K
v
A1
T32
T21
P
T22
T11
Q
D2
T12
L
D1
T1
W
D12
T2
M
D11
White
Yellow
R
Green
D22
Black
N
D21
Red
Brown
D32
O
D31
S
R
T
E
E
D
B
A
C
A
B
CN31
CN20
CN21
CN29
CN22
CN30
CN32
SW3
SW1
F
E
1
2
J
D
M1
M2
S
I
U
F
A Heat exchanger (field supply)
B Gas pipe
C Thermistor (gas pipe)
D Aluminum tape (field supply)
E Insulation
F Tie band
F
A Heat exchanger (field supply)
B Gas pipe
C Thermistor (liquid pipe)
D Aluminum tape (field supply)
E Insulation
F Tie band
G Capillary tube
A Thermistor (suction/discharge air)
B Clip
C Screw (field supply)
D Plate (field supply)
A Outer cover
B Inner cover
C Terminal block TB2
D Terminal block TB5
E Terminal block TB15
F Terminal block TBX
G Terminal block TB4
H Power supply (208 - 240 V)/Earth
I To outdoor unit
J To remote controller
K Distant signal (ON/OFF)
L Operation signal
M Error signal
N Fan signal
O Defrost signal
P Thermistor (gas pipe)
Q Thermistor (liquid pipe)
R LEV-kit
S Distant signal
T Thermistor
U Transmission
V Thermistor (suction air)
W Thermistor (discharge air)