3. Installation Guide

3.1 Position in relation to buildings

3.2 Excavation
a
Bedding made of backfilling material (A2) as defined under Item 2.1.
Add 200 mm in 2 layers of 100 mm each. Compact each layer thoroughly.
The bottom of the excavated pit must be an even, horizontal, dry surface.
A1: In-situ soil.
Premier Tech Aqua • Rewatec
®
17/28
Y: Height difference between the lower edge of
the foundation and the bottom of the excavated
pit
HB: Depth of the excavated pit; see Figure 2a
A1: In-situ soil; see also Item 1.3
500: Working space width
45° - 80°: Angle of repose
HE: Installation depth above the top of
the container
HT: Height of the container; see
Section 4.
HB: Height/depth of the excavated pit
200: Height of the bedding.(Figure 2a)
L: Length of the container
B: Width of the container