Herunterladen Inhalt Inhalt Diese Seite drucken

Rewatec NEO 15000 L Bedienungsanleitung Seite 19

Neo flachtanks
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Connect the pipes according to Section 2
Fill with water up to overflow/outlet
Fill in and compact material up to the top of the container (including the interior) as shown in
Figure 8.
Light machines can be used for compaction:
- If they do not touch the wall of the container
- Installations that can be walked on: degree of compaction M according to EN 1046
- Installations that can be driven on: degree of compaction W according to EN 1046
Fill in and compact material until about 200 mm below the ground surface as shown in Figure 9
3.4 Installing the version that can be walked on
Fill the rest of the upper 200 mm without compacting
Premier Tech Aqua • Rewatec
®
19/28
NEO Flat tanks
DORW5001-21.09.2016

Quicklinks ausblenden:

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis