Herunterladen Inhalt Inhalt Diese Seite drucken

Transportation And Storage - Gude W 370/4T Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für W 370/4T:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

Transportation and Storage

Transport wheels are fitted on the block splitting machine. To move the
machine, grip the machine transporting handle and lift the front of the
machine. Thus the machine may be moved with ease.
Air-relief screw on the rear side of the machine has to be in to prevent
oil leakage during the transport.
The splitting blade will retract automatically in its original position.
Assembly and First Putting in Operation
Structural Group 1
Structural Group 2
Fig. 4
Structural Group 3
Fig. 5
Structural Group 4
Fig. 6
Fig. 3
Required structural groups
Structural group 1
Required structural groups
Structural group 2
Required structural groups
Structural group 3
Delivery-contained
parts and accessories
Fig. 2 – pos. 1
Fig. 2 – pos. 8
Fig. 2 – pos. 5 / 2x
Fig. 2 – pos. 4 / 2x
Delivered parts and
accessories
Fig. 2 – pos. 7 / 2x
Fig. 2 – pos. 6 / 2x
Delivered parts and
accessories
Fig. 2 – pos. 3
Delivered parts and
accessories
Fig. 2 – pos. 2
Fig. 2 – pos. 5 / 2x
Fig. 2 – pos. 4 / 2x
52
GB

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

94698

Inhaltsverzeichnis