Herunterladen Inhalt Inhalt Diese Seite drucken

FALMEC GRUPPO INCASSO AP50 600 Bedienungssanleitung Seite 30

Inhaltsverzeichnis
Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 31
Fig. 5'
1) Carefully insert the pipe (A) in the motor fitting (D);
2) Fasten the pipe (A) to the hood body with the 3 screws (V3).
3) Insert the elbow (B) onto the pipe (A) and flange (FM).
4) Secure the elbow (B) to the pipe (A) with a clamp and bend the flaps of the flange (FM) as
indicated in the figure.
- Carry out electric connection only after having disconnected the electric power supply of the
hood.
Phase 4
Fig. 6'
1) Insert the extension (H) in the chimney (G).
2) Fasten it all (G+H) to the hood body using the screws (V4).
3) Slide the extension (H) until it reaches the desired height.
4) Place the bracket (L) on the wall, verify the horizontal alignment with a spirit level and mark
2 drilling points at the ends.
5) Drill, insert n. 2 expansion bolts of 4 mm ø and fasten the bracket (L) with the relative screws
(V5).
6) Screw the extension (H) to the bracket (L) using the 2 screws (V6).
Power the hood complying with the regulations in force (see sec. D of the booklet).
28
Inhaltsverzeichnis
loading

Inhaltsverzeichnis