Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Montagehinweise
30°
45°
60°
25-75°
Assembly instructions
Istruzioni di montaggio
Instructions de montage
Instrucciones de montaje
Lightning protection / Equipotential bonding of the building
must be observed. A safety gap of at least 1 m from any adjacent object that may be conductive must be left. In the
To enable potential equalisation of the building, the metallic conductor pipes of the solar circuit and all of the collector
Connections
must be used as connection elements between the collectors in order to compensate the length expansion of the
tightening the connections with the spanner, a torque of 30Nm should not be exceeded so as to prevent damage to
the manifold or absorber.
Collector angle / General notes
minimum angle of 25° and a maximum angle of 75°! The collector connections and the ventilation openings must be
protected against the penetration of water as well as against contamination through dust etc.
Warranty
Warranty claims can only be made if the supplier's own antifreeze has been used and maintenance has been carried

Installing the sensor

The sensor immersion sleeve must be installed on the solar supply, i.e. on the upper manifold of the last collector
connected in the series. If there are several series of collectors which are combined in a circuit, the sensor immersion
sleeve must be installed on the solar supply, i.e. on the upper manifold of the last collector connected in the series
farthest away from the pump.
12
EN

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Gk10

Inhaltsverzeichnis