Herunterladen Inhalt Inhalt Diese Seite drucken

RIKA LOOK Montageanleitung Seite 19

Vorschau ausblenden Andere Handbücher für LOOK:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Different basements
ast oot
Delivery state stove
Note
The stove is screwed with the transport construction on the pallet to secure it
against falling. All assembly operations have to be carried out in this secured
position!
Note
It is strongly recommended to use the "RIKA installation kit E15768" for
installation. Ask your local RIKA-dealer for it.
Tip
Use the enclosed felt gliders to protect your floor!
teel oot
oncrete ase
teel ase
Mounting support E15768
Insert the two „handles" in the top flue outlet so that the lower bending faces
outward.
Now insert the two spacers between them so that they engage with the tabs
into the slots.
Now the position of the two handles is fixed.
Put a stable rod or a square timber through the two openings. The stove can
now be lifted. A 3rd person should lead the bottom of the stove to find the
correct position on the basement.
Note
Do not use round rods or tubes, only rods with a flat contact surface. Risk of
slipping! Pay attention to the simultaneous lifting.
ooden ench
Base „ ar t "
18
|19

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis