Herunterladen Inhalt Inhalt Diese Seite drucken

Initial Commissioning - KERN MPC 250K100M Betriebsanleitung

Vorschau ausblenden Andere Handbücher für MPC 250K100M:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Insert batteries
Remove battery compartment cover
Connect battery holder to housing
contact acc. to illustration
Insert battery holder
Insert batteries into battery compartment
and lock with battery compartment
cover.

9.8 Initial Commissioning

In order to obtain exact results with the electronic balances, your balance must have
reached the operating temperature (see warming up time chap. 1). During this
warming up time the balance must be connected to the power supply (mains,
accumulator or battery) and be switched on.
The accuracy of the balance depends on the local acceleration of gravity.
The value of gravity acceleration is shown on the type plate.
16
MPC-BAPS-e-1710

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Mpc 250k100nm

Inhaltsverzeichnis