Installation

Switch off supply voltage!
Installation of the Insert 6401U-102-500
The Insert 6401 U-102-500 is installed in a conventional
flush-mounted box in accordance with DIN 49073, Part 1.
a. Installation in Conjunction with an Operating Ele-
ment
For installation site (see Fig. 3 and 4)
When combined with the IR Operating Element 6067-xxx-
10x-500, the installation site should be within the values
stated for the IR receiving range. Take into account the fact
that the IR receiving range can change as a result of
extraneous light (e.g, solar radiation, lighting).
To install the Operating Element
First set the desired address on the IR Operating Element
6067-xxx-10x-500. Clip the Operating Element onto the
Insert 6401U-102-500.
To remove the Operating Element
Lift the operating element up via the notches provided on
the left and right.