Herunterladen Inhalt Inhalt Diese Seite drucken

VEVOR XC2182 Originalanleitung Seite 6

Leitfaden fürbootstrailer
Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

  • DEUTSCH, seite 19
SIMPLE INSTRUCTION
Step1: Fix the component carrier
frame to the beam frame of the
carrier with U-shaped bolts.
It has an adjustment distance of
260mm on one side depending on
where the pole needs to be installed
for the width of your boat.
Step2: Install the
and fix it with two kits (8/4/5/9).
At this point, you need to first
determine the Angle at which you
want to install. Different angles
require different connection holes.
connecting pipe
You can also mount the bracket
under the trailer beam.
You can also install the U-bolts and
brackets using the method shown in
the left figure.
Inhaltsverzeichnis
loading

Inhaltsverzeichnis