4. Installation Conditions
The clearance between a foundation
of a structure and the plant must be
greater than 5 m.
> 5 m
If the plant is installed next to a traffic
> H
route, the minimum clearance to
these surfaces must be the depth of
H
the pit "H" at least.
A
When positioning the sewage treat-
ment plant, also take into account the
current or planned tree population.
To avoid damaging the plant, the
clearance between it and the trees
A
must be equal to the maximum ex-
pected diameter of the crown "A" of
.
the tree
7
42 / 96