Re-fill and re-pressurise system only
filling radiators to 50% full
With all radiator valves fully open
4
(including lock shields), switch on the
heating (approx. 60˚C) to allow chemical
to circulate.
Vibraclean process
6
Using an SDS drill on chisel action,
use the Vibraclean to loosen stubborn
debris. Continue this process until the
return hose on the MagnaCleanse runs
clear.
Isolate all radiators and starting with
7
one furthest away from the boiler, open
each radiator in turn to undertake the
Vibraclean
process
®
Repeat steps 6-7 on all radiators,
8
moving from the furthest away, to the
nearest to the boiler
Once Vibraclean process is complete
9
across all radiators. Turn radiators fully
on
60˚/ 1 Bar
ON
Measures must be taken to prevent
5
by-pass occurring between the flow
and return. This could be internal to the
boiler or externally installed by-pass
FILLING
FILLING
LOOP
LOOP
VIBRACLEAN