Dell PowerEdge M1000E Installationsanleitung Seite 25

Rack
Vorschau ausblenden Andere Handbücher für PowerEdge M1000E:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 58
4 Locate the three notches on each segment of the enumerator. Each
enumerator has the capacity to accommodate a sequence of eight cables
in one of three graduated thicknesses of cable fabric. For example, large
data cables seat in the largest notch in the segment and small fiber optic
cables seat in the smallest notch in the segment (see Figure 1-9).
5 Identify the cable notch size on the enumerator and seat each cable in
the group. Arrange the cables in the same sequence that they connect
to the system. (For example, if you have a column of eight cables, seat
the topmost cable in the first segment, and so on.) (See Figure 1-9.)
NOTE:
the cables in a variety of ways as long as you have no more than eight cables
grouped and attached to each enumerator.
Figure 1-9 shows 16 cables grouped and ordered with two enumerators: one
with the upper eight cables from both columns and the other with the lower
eight cables from both columns. For this same example, you can also group
and order each column of eight cables (not shown).
Securing the Cables to the Strain-Relief Bar
1 Locate the Velcro tie wraps that are included with your system
(see Figure 1-1 and Figure 1-2).
2 Facing the back of the system, position the tie wrap over the cable bundle
as it connects with the strain-relief bar (see Figure 1-9).
NOTE:
to wrap the cables and secure the cable bundles to the strain-relief bar using
the Velcro tie wraps.
3 To secure the cables to the bar, wrap the cable bundle by passing the tie
wrap around the back of the bar, and then wrapping around the cable
bundle again, crossing the tie wrap in front of the cables (see Figure 1-9).
4 The cables should be wrapped securely enough to stay bundled while still
able to slide on the strain-relief bar. This step ensures that you can easily
move bundles of cable clear of I/O modules during removal and
installation.
NOTE:
your system to the strain-relief bar with Velcro tie wraps as shown in
Figure 1-9. See the Getting Started Guide for instructions on attaching the
power cable retention clip, which adds additional strain relief to your system.
Depending on your cabling configuration, you can group and order
Depending on your system configuration, there are a number of ways
Ensure that you secure all power cables routed from either side of
Rack Installation Guide
23