Herunterladen Inhalt Inhalt Diese Seite drucken

GEZE TS 5000 E-ISM Montageanleitung Seite 16

Gleitschiene mit integrierter schließfolgeregelung und elektrischer feststellung
Vorschau ausblenden Andere Handbücher für TS 5000 E-ISM:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Initial operation
Open door leaf to desired hold-open angle and fix it there (1.).
X
X
Remove cable protection foils from guide (2.).
X
X
Loosen clamping screws of electrical hold-open device (3.).
X
X
Move electrical hold-open device until catch contacts sliding block (4.).
X
X
Screw down electrical hold-open device securely (5.).
X
X
To prevent loops from forming, tighten cable and fasten cable protection at hold open device end (6.).
X
X
Stow away (7.) loose cable in the cable protection and free area.
X
X
Secure exposed cable with the cable protection film (8.).
X
X
CAUTION!
Check free upward movement of the rocker!
X
X
If necessary, the holding force can be adjusted (9.). According to EN 1155, the release torque should
amount to 40 Nm - 120 Nm for a door with 90° hold- open angle.
6. 1 1 Mounting cover panel
CAUTION!
Do not pinch cable.
X
X
85
Clip on moving-leaf cover panel and fixed-leaf cover panel (1.).
X
X
Shorten adjustable-size middle cover panel "A" to size "C" (Fig. 6.11.1).
X
X
Clip on middle cover panel (2.).
X
X
Insert inspection caps between cover panels (3.).
X
X
7
Initial operation
7. 1
First Operation and Function Test
Switch on power.
X
X
Open moving leaf and engage in electrical hold-open device.
X
X
Open fixed leaf and engage in electrical hold-open device.
X
X
Push moving leaf out of electrical hold-open device.
X
X
Fixed leaf closes automatically. Moving leaf remains in waiting position of closing sequence control and also
closes when fixed leaf is closed.
GB 8
TS 5000 E-ISM
85
Fig. 6.11.1

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis