Herunterladen Inhalt Inhalt Diese Seite drucken

GEZE TS 5000 E-ISM Montageanleitung Seite 12

Gleitschiene mit integrierter schließfolgeregelung und elektrischer feststellung
Vorschau ausblenden Andere Handbücher für TS 5000 E-ISM:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Mounting and securing
Mark out and drill fixing holes for door closer and guide rail using fitting template or cut M5 thread if necessary.
X
X
Drill additional hole (A) for 24V DC power supply.
X
X
In case this product is in use with an hold-open device, please observe the document "Instructions for Installati-
on, Commissioning, Operation and Maintenance of the GEZE Hold-Open Device FA GC" as well.
6.2
Mount guide rails and end caps
Remove 24 V fixed-leaf cable of the electrical hold-open device sideways from fixed-leaf guide rail (1.).
X
X
Align spacers on moving and fixed-leaf guide rails (2.).
X
X
Fix guide rails in place (tightening torque: 2 Nm) (3.).
X
X
Align end caps on moving leaf and screw on (4.) (tightening torque: 2 Nm).
X
X
Align end caps on fixed leaf and screw on. (5.) (tightening torque: 2 Nm).
X
X
Mount door closer according to the mounting instructions (6.).
X
X
All screwing torques are to be adjusted on site, if necessary.
6.3
Connecting 24 V fixed-leaf cable
red ='+'
white = '–' .
Route 24 V fixed-leaf cable of electrical hold-open device to the supply terminal. Secure cable with adhesive
X
X
tape if necessary (1.).
Shorten excess cable to approx. 40 mm (2.).
X
X
Connect cable to terminal (3.).
X
X
GB 4
TS 5000 E-ISM
Fig.: 6.2.1
Fig.: 6.3.1

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis